
BIM 4D + 5D
#3D BIM Source Model #Primavera #Navisworks #Excel #WBS #BIM #4D #5D
**2021 Workflow preference note**
In this general workflow, Primavera and Navisworks timeline have been featured.
However, there are more UI friendly applications out there with better visualisation and inter-operability from my point of view.
I prefer using Assemble (Part of Autodesk Construction Cloud) and Hexagon EcoSys as they integrate seamlessly from a single source of truth, leveraging information delivery and administration).
Also, even Twinmotion for construction timeline simulator rather than Navisworks - As we all acknowledge that NW is being a pain from its instability issue and has been abandoned by Autodesk for quite long time.
4D & 5D BIM play crucial role in the project
-
Reduce Time Schedule
-
Increase Earn Value and project efficiencies
CRITICAL for Project managers & Cost Planners
TERMS - Definitions of 4D & 5D BIM by NBS (National BIM Standards)
BIM 4D is Construction sequencing: Add Scheduling data to 3D Model
BIM 5D is Cost Implications and quantification:
Extract accurate cost information from 3D model
Estimate purchasing/installing/replacement cost from 3D model
4D & 5D DELIVERY through INTER-OPERABILITY
-
PLANT 3D/REVIT/RHINO/ARCHICAD/BENTLY etc
-
PRIMAVERA
-
NAVISWORKS
-
EXCEL

BIM 4D Workflow
From Traditional 4D Primavera exported XLSX file or BIM-abled 4D, import CSV into Data Sources of NW Timeliner

By Auto-Attaching to Searchset


Configure Appearance Definitions

Simulation Setting

BIM 4D Workflow
BIM 5D Workflow
-
Prepare 3D BIM Model
-
Export DWG/DWFX
-
Export XLS/CSV Files
-
Create XLSX workbook
-
Navisworks to open DWG and Create the FEDERATED model (NWF)
-
Using Data Tools icon, Import XLSX file
[Data Tools Overview - Imported information Mapping Setup]

-
Find Items to create Searchsets
-
Prepare Quantification Workbook
-
Prepare Query Project Setup Parameters
- MasterFormat
- UniFormat
- Custom (XML): Company/Project Specific
- None: Create from Scratch
-
Export XLSX from Primavera P6 and Import to NWF
[Primavera P6 Overview - Export from Resources Tab]

-
Fill in Mandatory fields and Export Catalogues under Result Connect Tab
- WBS (Work Breakdown Structure), Type and Name sections are Mandatory to be filled in!
- WBS is to build the hierarchy between Group and Item Type
- Transparency range can be established on item only. In between from 0 (Transparent) to 1 (Opaque), Default is 0.3
- Color can be assigned to item only. Prefer controlled by template.
- Primary Quantity Units can be defined for item only

[Import Catalog through Quantification Workbook from NWF]

-
Catalogues will be loaded into Resource and Item Catalog, respectively.
[Optimisation & Quantification of Workbook (NWF)]


By going through these mapping, the Quantification Workbook will receive proper measurements and values.
-
Quantification of Non-Physical Labor can be defined from Resource Catalog
-
2D Take-Off can be also done through by importing Vectorised PDF or DWG
-
Change Analysis will be allowing us to accept/decline/hold the changes when there are modifications from model
-
Workbook can be exported to Excel format for further development of Costing and Quantification